Galaris · Present and compare a project

Claire prepares Emma's property project with Iris

Claire helps Emma imagine life in an apartment. With Iris, her property agent in Galaris, she brings photos, financing and renovation together in a pack that develops with her client's questions.

A faithful presentation of the property

Iris prepares Apartment — Emma’s Project: a fictional 65 m² apartment offered at €240,000. The pack separates entered facts, assumptions and calculated results.

The enhanced photo depicts the same room: brighter exposure, corrected white balance and adjusted framing. It preserves openings, fixtures and visible marks. In this demonstration, the source photo is also generated; no renovation or furniture is added.

The same room, a clearer photo — Synthetic source and enhancement of the same image: exposure, white balance and framing, with no renovation shown.
The same room, a clearer photo — Synthetic source and enhancement of the same image: exposure, white balance and framing, with no renovation shown.C68

Discuss financing by changing the assumptions

Emma changes her contribution, renovation budget, term, rate and insurance. The document recalculates financing needs and monthly payments, then compares 20 and 25 years using identical assumptions.

With a €45,000 contribution, €22,000 renovation, €18,000 acquisition costs and €7,000 reserve, the project totals €287,000, with an indicative financing need of €242,000. At 3.6% and illustrative insurance of 0.3%, displayed monthly outlay is €1,476.47 over 20 years, compared with €1,285.03 over 25 years; total lifetime cost increases.

Explore Emma’s financing — Editable contribution, renovation, term, rate and insurance; indicative results and a 20/25-year comparison.
Explore Emma’s financing — Editable contribution, renovation, term, rate and insurance; indicative results and a 20/25-year comparison.C69

Carry a revised quote into the pack

The fictional electrical quote rises from €5,000 to €7,000. Iris updates the schedule and renovation budget: electrical work, painting, flooring and kitchen now total €22,000. The pack connects the costs to a proposed timetable.

Renovation and its revised cost — Electrical €7,000, painting €4,000, flooring €6,000, kitchen €5,000: total €22,000, proposed schedule.
Renovation and its revised cost — Electrical €7,000, painting €4,000, flooring €6,000, kitchen €5,000: total €22,000, proposed schedule.C70

Explore a deferral without erasing its cost

If postponing the kitchen proves feasible, Phase 1 falls to €282,000, but the €5,000 kitchen remains payable later: the overall budget stays €287,000. The pack keeps both scopes side by side.

Defer the kitchen without erasing its cost — Phase 1 €282,000 and later kitchen €5,000; overall budget remains €287,000, subject to feasibility.
Defer the kitchen without erasing its cost — Phase 1 €282,000 and later kitchen €5,000; overall budget remains €287,000, subject to feasibility.C71

Emma saves her personal trial — here a €50,000 contribution over 25 years — in a Dataset, then loads it again. Her trial leaves the pack’s source assumptions intact.

Reload a personal trial — The €50,000 contribution over 25 years is retained in a Dataset, separate from the pack’s assumptions.
Reload a personal trial — The €50,000 contribution over 25 years is retained in a Dataset, separate from the pack’s assumptions.C72

This pack was run in Galaris using fictional data and images, in English. Figures are illustrative; they are neither a bank offer nor professional quotes. The deferral remains conditional. The calculator runs inside the document; saving requires Dataset rights and access consent.

Explore interactive documents and media creation tools.